Close Menu
 VONa Communications VONa Communications
  • Home
  • News
  • Politics
  • Business/Economy
    • Oil $ Gas
    • Tech
    • Energy
  • Crime
  • Entertainment
    • Celebrity News
    • Fashion & Style
  • Sports
  • World News
    • Across Africa
    • US News
    • UK News
    • Europe
    • Asia News
  • More
    • Current Affairs
    • Education
    • Fashion
    • Press Release
    • Opinion

Subscribe for Updates

Get the latest news from Voice of Naija about Politics, current affairs, Sports, business etc.

What's Hot

LASU Acknowledge Student Stephen Who Played Key Role In Historic U17WWC Triumph

November 14, 2026

Tinubu Assures Displaced Residents Of Safe Return After Plateau Attacks

November 14, 2026

“List Your Achievements” — Hilda Dokubo Challenges Dave Umahi

November 14, 2026

AFFAN AGM: Former Athlete Calls For Renewed Investment In Grassroots Sports

November 14, 2026
Facebook X (Twitter) Instagram
 VONa Communications VONa Communications
  • Get In Touch
  • About Us
Facebook X (Twitter) Instagram
SUBSCRIBE
  • Home
  • News
  • Politics
  • Business/Economy
    • Oil $ Gas
    • Tech
    • Energy
  • Crime
  • Entertainment
    • Celebrity News
    • Fashion & Style
  • Sports
  • World News
    • Across Africa
    • US News
    • UK News
    • Europe
    • Asia News
  • More
    • Current Affairs
    • Education
    • Fashion
    • Press Release
    • Opinion
 VONa Communications VONa Communications
Home»News»Aba Power Plant Comes On Stream 20 Years After Conception
News

Aba Power Plant Comes On Stream 20 Years After Conception

Alexandra UmehBy Alexandra UmehFebruary 27, 20242 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Reddit WhatsApp Email
images 34 1
Aba Power Plant Comes On Stream 20 Years After Conception
Share
Facebook Twitter LinkedIn Pinterest WhatsApp Email

ENUGU, Nigeria (VOICE OF NAIJA)- The Aba Integrated Power Project, owned by the Geometric Power Group, finally came on stream on Monday, 20 years after it was conceived by its CEO Barth Nnaji.

The power plant, located at Osisioma, near Aba, was inaugurated by President Bola Tinubu amidst wild jubilation by the Aba business community and residents.

Nnaji said the plant was conceived in March 2004 as “a child of necessity by the desire to increase power supply nationwide.”

He said the project was the outcome of a meeting between Aba industrialists, Ariaria International Market Traders, along with the then-president of the World Bank, James Wolfenson, and the then-finance minister, Ngozi Okonjo-Iweala, now director-general of the World Trade Organisation.

He said the stakeholders felt the best way to give Aba metropolis a reliable power supply was to build an autonomous power project, with excess power supplied to the national grid.

He said the facility was licensed to produce 188 megawatts of electricity but was starting with 141 megawatts from three turbines.

The plant can generate and distribute power within the Aba Ring-Fenced Area (ARFA), which comprises nine of the 17 LGA.

READ ALSO: Light-Up Nigeria Project New Dawn For Power In South East – Mbah

The facility comprises two companies – Geometric Power Aba Limited, the power generation arm, and Aba Power Limited Electric, its power distribution arm.

From conception to finish, Nnaji said the project gulped about $800 million.

He said it suffered hitches after GPAL acquired ARFA and soon lost it to Enugu Electricity Distribution Company (EEDC) due to a wrong privatisation process in 2013.

He said the resultant crisis compelled Geometric Power Group to seek redress in Court for nine years until former President Muhammadu Buhari, through ex-power minister Babatunde Fashola, resolved the dispute in 2016.

After that, Nnaji said the company “went to work assiduously to pay off huge debts EEDC claimed GPAL owed it to the tune of $26 million to reclaim the ARFA.”

He said the company also sent abroad its turbines not used for one day for refurbishment and perfected gas supply arrangements to power its existing three turbines.

NAN.

Previous ArticleMavin Record: Don Jazzy Sells Majority Stakes Of Label To Universal Music Group
Next Article Alia Launches Probe To Investigate Ortom’s Handling Of Benue Funds
Alexandra Umeh

Alexandra Umeh is based in the eastern region of Nigeria. She covers politics, news writing, feature stories, among others. She has multitasking skills and can easily adapt to any working condition. She enjoys reading and writing.

Related Posts

Arokodare Brace Helps Super Eagles Secure 3-1 Win Over Tanzania

November 13, 2026

EU Leaders Meet Over AI Competition, Safety

November 13, 2026

Swiss Woman Who Tested Positive For Ebola In Nigeria Recovers In Geneva

November 13, 2026

Makinde Says 2027 Presidential Ambition May Have Changed Ties With Tinubu

November 13, 2026

2027: Makinde Banks On Oyo Performance To Secure Presidential Victory

November 13, 2026

UNN Party Tragedy: Survivor Recounts Waking Up To Find Friends Dead

November 13, 2026

2027: Buhari’s Supporters Now Backing Atiku – Dalung

November 13, 2026

UNN Deaths: Mbah Orders Investigation, Moves To Ban Sign-Out Parties

November 13, 2026

Rubik’s Cube Production Returns To Hungary

November 13, 2026
Leave A Reply Cancel Reply

You must be logged in to post a comment.

Advertise with us
NRS
[instagram-feed feed=1]
 VONa Communications
Facebook X (Twitter) Instagram YouTube
  • Contact
  • Authors
  • About Us
© 2026© VONa Communications. All Rights Reserved

Type above and press Enter to search. Press Esc to cancel.