Close Menu
 VONa Communications VONa Communications
  • Home
  • News
  • Politics
  • Business/Economy
    • Oil $ Gas
    • Tech
    • Energy
  • Crime
  • Entertainment
    • Celebrity News
    • Fashion & Style
  • Sports
  • World News
    • Across Africa
    • US News
    • UK News
    • Europe
    • Asia News
  • More
    • Current Affairs
    • Education
    • Fashion
    • Press Release
    • Opinion

Subscribe for Updates

Get the latest news from Voice of Naija about Politics, current affairs, Sports, business etc.

What's Hot

Don Jazzy Tackles Nigerian Artists Over Decline In Music Collaborations

November 13, 2026

Veekee James Sparks Second Pregnancy Rumors Six Months After Welcoming First Child

November 13, 2026

Speed Darlington Apologizes To Burna Boy Over Sexuality Comments

November 13, 2026

Terry Waya Says Farming, Networking Made Him A Billionaire

November 13, 2026
Facebook X (Twitter) Instagram
 VONa Communications VONa Communications
  • Get In Touch
  • About Us
Facebook X (Twitter) Instagram
SUBSCRIBE
  • Home
  • News
  • Politics
  • Business/Economy
    • Oil $ Gas
    • Tech
    • Energy
  • Crime
  • Entertainment
    • Celebrity News
    • Fashion & Style
  • Sports
  • World News
    • Across Africa
    • US News
    • UK News
    • Europe
    • Asia News
  • More
    • Current Affairs
    • Education
    • Fashion
    • Press Release
    • Opinion
 VONa Communications VONa Communications
Home»Current Affairs»Girldlock: FG To Build Flyover On Mararaba Road
Current Affairs

Girldlock: FG To Build Flyover On Mararaba Road

Emmanuel OlabiwonninuBy Emmanuel OlabiwonninuJanuary 25, 20243 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Reddit WhatsApp Email
download 21 2
Girldlock: FG To Build Flyover On Mararaba Road
Share
Facebook Twitter LinkedIn Pinterest WhatsApp Email

ENUGU, Nigeria (VOICE OF NAIJA)- Works minister David Umahi has called for redesigning the Abuja-Keffi Expressway to include a flyover to end the persistent gridlock on the Nyanya-Mararaba axis in Karu in Nasarawa.

Umahi said this during the site inspection of the reconstruction and rehabilitation of Abuja-Mararaba-Keffi Road on Thursday.

The project is under the Road Infrastructure Development and Refurbishment Investment Tax Credit Scheme handled by China Harbour Engineering Company Limited.

Umahi urged the firm to develop the redesign within seven days, adding that it would help reduce the gridlock experienced on the road.

While noting that the work on the 43.56km road would be the rehabilitation of the dual carriageway, the minister said the road would be tolled after completion with various facilities to ease travellers’ journey on it.

READ ALSO: FG Denies Plans To Relocate Federal Capital To Lagos

“This road is very important. I want you to complete the road in 12 months, and as soon as we complete it, we will toll it. It will be added to the tolling of the Keffi-Makurdi, which is why the public-private Partnership people are here. We have directed that in this section, we will bring solar lights, CCTV and security at the service stations.

“I want the director in charge of the project to reach out to the governor of Nasarawa state so that we can acquire land within the corridor where we will build the service station and the toll gates.

“We will complete the redesign within seven days. Do not bring any laterite on the road; the road is stable, the pavement is gone, and we have to reinstate it. Our design is going to be one of the best because we are bringing certain construction materials to add to the strength of the stone base and the asphalt”, Umahi said.

The minister added that the project funded by NNPC should have two construction sites, one located at the Mararaba section. He also said that the construction would mostly be at night to avoid disrupting vehicular movements.

“The traffic is high on the road and if we do anything during the day, it will inconvenience the people. I will be part of the supervision at night. We are considering a flyover in Mararaba because of the congestion in traffic.

“So I want us to study it in seven days to come up with a design of the location. We want before the middle of February to start the construction of a flyover there,” Umahi said.

The project awarded on 19 April, 2023, commenced on 20 December, 2023, and will be completed in May 2026.

NAN.

Previous Article28-Yr- POS Ooperator Jailed For 12 Months For Cheating
Next Article AFCON: Don’t Watch US On TV Anymore – Super Eagles Captain Musa Tells Tinubu
Emmanuel Olabiwonninu

Experienced freelance journalist with a passion for telling compelling stories. Adept at conducting indepth research, interviewing diverse individuals, and crafting engaging narratives for print and online publications. Proven ability to meet tight deadlines and adapt writing style to suit various editorial guidelines. Areas of expertise include, Social justice, Data reporting, sports, Geopolitics and Climate Change.

Related Posts

UK Economy Records Fastest Growth In Two Years

November 12, 2026

COP31 Divided As Countries Clash Over Fossil Fuels

November 12, 2026

UN Postpones Review Of US Human Rights Record Again

November 12, 2026

Nvidia CEO Scandal Sparks New US-China Security Debate

November 11, 2026

Prince William’s Land Sale Raises Farmers’ Concerns

November 11, 2026

Kenyans Fear More Deadly Floods As El Niño Strengthens

November 11, 2026

Nearly 6,000 Migrants Reach Canary Islands In 10 Days

November 11, 2026

World Leaders Face Pressure At COP31 Climate Summit

November 11, 2026

Piracy Returns To Gulf Of Aden As Shipping Risks Grow

November 10, 2026
Leave A Reply Cancel Reply

You must be logged in to post a comment.

Advertise with us
NRS
[instagram-feed feed=1]
 VONa Communications
Facebook X (Twitter) Instagram YouTube
  • Contact
  • Authors
  • About Us
© 2026© VONa Communications. All Rights Reserved

Type above and press Enter to search. Press Esc to cancel.